SMC 문제 1

You are the Scrum Master for a team that is working on a project for a chemical engineering company. During one of the Sprints, the Product Owner suggests changes to the Acceptance Criteria on the basis of new requirements by the stakeholders. Which of the following best describes the steps that should be taken next in this situation?

SMC 문제 2

A Scrum Team must produce the following artifacts. Select all that apply.

SMC 문제 3

Which of the following meetings is not usually Time-boxed?

SMC 문제 4

The Scrum Team along with the Scrum Master adopted theFist of Five technique to arrive at accurate estimations for the prioritized User Stories. The results of the vote of each team member are as follows: three members: 2 fingers; four members: 3 fingers; and two members: 5 fingers. Which of thefollowing options is in plurality?

SMC 문제 5

One of the responsibilities of the Scrum Master is to ensure that the Product Owner does not change the Acceptance Criteria of a committed User Story in the middle of a Sprint. In this regard, which of the following statements about Acceptance Criteria is correct?