SMC 문제 31
A User Story is considered complete only when the which of the following is/are satisfied?
A) Acceptance Criteria
B) Done criteria
C) Demo to the product owner
D) Non-functional criteria
A) Acceptance Criteria
B) Done criteria
C) Demo to the product owner
D) Non-functional criteria
SMC 문제 32
What is the recommended size of a Development Team?
SMC 문제 33
Which of the following best describes why Epics are decomposed into smaller User Stories during a Sprint?
SMC 문제 34
You are the Scrum Master of a project to construct an IT Tech Park. This project requires adhering to stringent quality standards at every stage of development. A Scrum Core Team is formed for this project in which the Scrum Master is supposed to facilitate a "team first" mentality when it comes to quality. You must ensure all of the following to maintain quality in Scrum, EXCEPT:
SMC 문제 35
Which of the following is/are role(s) of a Chief Scrum Master, not of a Chief Product Owner?
A) Addresses impediments that impact more than one Scrum Team.
B) Prepares and maintains the overallPrioritized Product Backlog for the large project.
C) Facilitates the Scrum of Scrums meetings.
D) Interfaces with the Program Product Owner to ensure alignment of the large project with the goals and objectives of the Program.
A) Addresses impediments that impact more than one Scrum Team.
B) Prepares and maintains the overallPrioritized Product Backlog for the large project.
C) Facilitates the Scrum of Scrums meetings.
D) Interfaces with the Program Product Owner to ensure alignment of the large project with the goals and objectives of the Program.