SAFe-SASM 무료 덤프문제 온라인 액세스

시험코드:SAFe-SASM
시험이름:SAFe Advanced Scrum Master (SASM)
인증사:Scrum
무료 덤프 문항수:62
업로드 날짜:2026-10-12
평점
100%

문제 1

A Scrum Master is frustrated that her team finds no value during Iteration retrospectives, and the team has asked that she cancel all future ones. Which two specific anti-patterns are most likely present within the team's retrospectives? (Choose two.)

문제 2

Why is the program predictability measure the primary Metric used during the quantitative measurement part of the Inspect and Adapt event?

문제 3

Which two Framework elements would a Scrum Master have the strongest connection and most frequent interaction? (Choose two.)

문제 4

The Agile Team includes the Scrum Master and which other key role?

문제 5

What is a Product Owner (PO) anti-pattern in Iteration planning?

댓글 추가

귀하의 메일주소는 공개되지 않습니다. 필수 입력 사항은 표시되어 있습니다. *

insert code
그림의 인증번호를 입력하세요.