E-S4HCON2022 무료 덤프문제 온라인 액세스
| 시험코드: | E-S4HCON2022 |
| 시험이름: | SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade |
| 인증사: | SAP |
| 무료 덤프 문항수: | 75 |
| 업로드 날짜: | 2026-09-03 |
You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response: