C_TSCM42_65 무료 덤프문제 온라인 액세스

시험코드:C_TSCM42_65
시험이름:SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP5
인증사:SAP
무료 덤프 문항수:80
업로드 날짜:2025-08-31
평점
100%

문제 1

You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling).
Which of the following statements is true for the resulting dependent requirements?

문제 2

You want to use the different options for planning in SAP ECC.
What is the correct sequence of the planning procedures?

문제 3

A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order. The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.
Which of the following statements are true for the two lists at this stage? (Choose two)

문제 4

The stock/requirements list for a finished product contains only one customer order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date of the fixed planned order is set to a later date compared to the one of the customer order. However, a corresponding rescheduling exception message does not occur.
What could be the reason? (Choose two)

문제 5

What are characteristics of repetitive manufacturing? (Choose three)

댓글 추가

귀하의 메일주소는 공개되지 않습니다. 필수 입력 사항은 표시되어 있습니다. *

insert code
그림의 인증번호를 입력하세요.