C_DBADM 무료 덤프문제 온라인 액세스
| 시험코드: | C_DBADM |
| 시험이름: | SAP Certified - Database Administrator - SAP HANA |
| 인증사: | SAP |
| 무료 덤프 문항수: | 216 |
| 업로드 날짜: | 2026-10-20 |
<strong>CHALLENGE 4 — Rollout Recovery Validation Gate</strong>
The rollout lead can release the plant wave on schedule using backup completion evidence, or delay briefly to include recovery validation for the wave database and recoverability evidence for the pilot system. Which path is most defensible?
<strong>CHALLENGE 4 — Rollout Recovery Validation Gate</strong>
Backups completed for the upgraded pilot system and the newly installed SAP HANA wave database before the rollout checkpoint. Recovery validation for the wave database is scheduled but not complete, and the pilot system has only backup completion evidence. What should happen before wave release approval?
A consumer lending firm runs an on-premises SAP HANA database for core transaction support and uses SAP HANA Cloud for selected analytical workloads. During the morning review, administrators see that the database remains available and background jobs finished, but one monitoring dashboard now shows repeated alert bursts for a short interval after each monitoring cycle.
The alert pattern clears on its own and does not affect general user processing. A team member recommends disabling the noisy alert because it looks self-correcting. The operations lead wants to keep monitoring reliable without hiding a genuine issue, and the first action must stay within current operating scope.
What is the best first action?
<strong>CHALLENGE 1 — Recovery Review Configuration Traceability</strong> The recovery review coordinator wants to accept the comparison because patient-flow reports opened successfully. The database team later confirms that the upgraded reporting system’s administration record does not reflect the configuration state used during testing. Which decision best supports readiness-quality evidence?
<strong>CHALLENGE 3 — Cloud Modernization Evidence Boundary</strong> The leadership update needs to cover current hypercare readiness and future SAP HANA Cloud reporting migration. The on-premises hypercare systems have backup and monitoring evidence, while the cloud database has provisioning and sample data only. Which action best supports accurate decision-making?