C-DBADM-2601 무료 덤프문제 온라인 액세스
| 시험코드: | C-DBADM-2601 |
| 시험이름: | SAP Certified - Database Administrator - SAP HANA |
| 인증사: | SAP |
| 무료 덤프 문항수: | 217 |
| 업로드 날짜: | 2026-09-03 |
CHALLENGE 1 - Cutover Configuration Evidence Traceability
During cutover readiness rehearsal, warehouse test users can open freight capacity reports from both SAP HANA systems. The installed validation database has its active configuration documented, but the upgraded distribution reporting system has one stabilization value recorded only in monitoring notes. What should the administrator do before accepting the cutover comparison?
CHALLENGE 3 - Quota and Source Coordination for Multi-Vendor Materials
The sourcing lead wants to preserve vendor-sharing for priority materials so the first live week has more resilient coverage. A plant buyer wants to simplify those same materials to a single vendor during cutover because the order path looks more stable. Which option is most appropriate?
A utilities provider operates SAP HANA in a mixed landscape, with an on-premises database supporting operational workloads and SAP HANA Cloud used for newer reporting services. During the morning review, administrators see that the database remains available and scheduled backups completed, but one recurring health check now reports sustained delay in a narrow set of monitoring results.
General user activity is unaffected. A junior team member recommends broad resource expansion because delayed monitoring often appears during heavier runtime periods. The operations lead wants the first step to stay within the existing maintenance scope and identify whether the slowdown is caused by the monitoring design itself or by an actual platform issue.
What is the best first action?
CHALLENGE 4 - Service Continuity Recovery Gate
The service lead can accept hypercare readiness on schedule using backup completion evidence, or delay briefly to include recovery validation for the stabilization database and recoverability evidence for the upgraded system. Which path is most defensible?
CHALLENGE 4 - Close Recovery Readiness Gate
Backups completed for the upgraded claims reporting system and the newly installed validation database before close rehearsal. Recovery validation for the validation database is scheduled but not complete, and the upgraded system has only backup completion evidence. What should happen before final close sign-off?