The main purpose of a Stage 2 third-party audit is to evaluate the implementation and effectiveness of the organisation's management system and to identify any nonconformances against the requirements of the standard12. The other options are either the objectives of a Stage 1 audit (A, D) or a specific aspect of the audit scope (B). References: 1: ISO/IEC 27006:2022, Information technology - Security techniques - Requirements for bodies providing audit and certification of information security management systems, Clause 9.2 \n2: PECB Certified ISO/IEC 27001 Lead Auditor Exam Preparation Guide, Domain 4: Preparing an ISO/IEC 27001 audit
ISO-IEC-27001-Lead-Auditor-KR 문제 127
다음 중 ISMS 제3자 인증 감사 기준으로 사용되는 두 가지 기준은 무엇입니까?
정답: D,E
The two standards that are used as ISMS third-party certification audit criteria are ISO/IEC 27001 and relevant legal, statutory, and regulatory requirements. ISO/IEC 27001 specifies the requirements for establishing, implementing, maintaining, and continually improving an information security management system (ISMS)1. Relevant legal, statutory, and regulatory requirements are those that apply to the organization's information security aspects and objectives2. The other options are either not standards (E) or not directly related to the ISMS certification audit criteria (A, B, C, F). References: 1: ISO/IEC 27001:2022, Information technology - Security techniques - Information security management systems - Requirements, Clause 1 \n2: ISO/IEC 27001:2022, Information technology - Security techniques - Information security management systems - Requirements, Clause 4.2
ISO-IEC-27001-Lead-Auditor-KR 문제 128
감사팀 리더는 올해 초 제3자 감시 감사를 완료한 후 후속 감사를 계획하고 있습니다. 그들은 시정 조치를 고려하기 전에 시정이 필요한 불일치 사항을 확인하기로 결정했습니다. 아래 설명을 기준으로 볼 때, 감시 과정에서 발견된 불일치 사항에 대한 시정 사항은 다음 중 어느 것입니까?
정답: A,B,C,E
According to the PECB Candidate Handbook for ISO/IEC 27001 Lead Auditor, a correction is an action to eliminate a detected nonconformity, such as rework, repair, or replacement1. The examples of A, B, C, and E are corrections because they fix the errors or defects that caused the nonconformities, such as a missing signature, a missing guide, a wrong date, or a wrong colour code. The other examples (D, F, G, and H) are not corrections, but corrective actions, because they address the root causes of the nonconformities, such as inadequate training, poor planning, ineffective documentation, or unclear responsibility2. References: 1: PECB Candidate Handbook for ISO/IEC 27001 Lead Auditor, page 35, section 4.5.12: PECB Candidate Handbook for ISO/IEC 27001 Lead Auditor, page 36, section 4.5.2.