This controls the effects of abnormal demand with a maximum percent of the original quantity forecast that a single Sales Order can consume.
What is referred to in the above statement?
Identify three correct ways to view differences between an unconstrained demand plan and a constrained demand plan.
ABC Corporation uses a third-party configuration tool for booking their configured sales orders and creating a configured Bill of Material (BOM). This is a simple configuration process.
However, during the Implementation of Oracle E-Business Suite, the client installed Inventory, BOM, Work In Process (WIP), Engineering, Order Management, Receivables, and General Ledger modules. The SuperUser wants Oracle to be used for creating a configured BOM when a Sales Order Is created.
What would be your recommendation in this situation?