1Z0-1047-20 무료 덤프문제 온라인 액세스
| 시험코드: | 1Z0-1047-20 |
| 시험이름: | Oracle Absence Management Cloud 2020 Implementation Essentials |
| 인증사: | Oracle |
| 무료 덤프 문항수: | 102 |
| 업로드 날짜: | 2026-08-30 |
A worker is scheduled to work from Monday to Friday. As an HR administrator, you receive a call from the worker on Friday evening 16-Jun-2017, that they are on vacation from 17-Jun-2017 (Saturday) and will be back at work on 26-Jun-2017 (Monday). The absence type for vacation has no duration formula or plans attached and the duration is measured in Days. There is a calendar exception on 23-Jun-2017 (Friday).
What should be the start date, end date, and the duration of this absence record if the "Schedule nonworking days" is set to "Not enabled"?
You defined a 3-month rolling-backward term in your qualification plan with the include overlap rule. You set up entitlement bands as shown below:
SequenceDurationPayment Percentage
1.)10 days100%
2.)10 days50%
You submit a 10-day absence. Another 4-day absence already exists which starts within 3 months earlier than the start date of the current absence.
Which option corresponds to the behavior in terms of entitlement usage, based on this configuration?
Your client has a requirement that the employee will not get enrolled into the plan for first six months of hire. Enrollment and accruals will start after the completion of six months. The plan needs to be Front-Loaded.
How will you configure this in the system?
When assigning work schedules via Manage Work Schedule Assignment Administration task, which level has the highest priority and which level the lowest?