문제 1

A company plans an implementation of Dynamics 365 Supply Chain Management.
The warehouse manager requires that if an item is picked for production from a bin location that has only a few items left, the picker must pick all remaining items from the location. You need to configure picking to meet the warehouse manager ' s requirement. Which prerequisite should you configure?

문제 2

A beverage manufacturing company is implementing Dynamics 365 Supply Chain Management.
The company will use the batch balancing functionality to create the beverages.
IngredientA must be configured for a target value of 40 with a minimum of 35 and a maximum of 45.
IngredientB must be configured to account for target value variances.
You need to configure the ingredient-based calculations
Which ingredient type should you configure for each requirement? To answer, drag the appropriate ingredient types to the correct requirements. Each ingredient type may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

문제 3

A company produces homeopathic lotions (or pain relief and uses Dynamics 365 Supply Chain Management.
Several components used in the production of the pain-relieving lotion and oils have special government- mandated reporting requirements.
You need to ensure the company can provide the appropriate reporting and tracking for these components.
Which parameters should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

문제 4

A manufacturing company is implementing Dynamics 365 Supply Chain Management.
The company has three operations in the production of a finished good. The first operation assembles the product, the second operation sends the product to a subcontractor to do a custom welding job on the product, and the final operation is painting the finished good.
The controller requires that the semifinished item is physically and financially recorded in the general ledger while at the subcontractor location.
You need to configure the requirements.
What should you configure?

문제 5

You need to configure scheduling for each production area.
Which scheduling options should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.