문제 1

Your company assigns you to a Scrum team. You are planning the release and sprint.
You have created global lists, which are pick lists that you can include in one or more fields and types of work items.
The product owner reviews the Product Backlog with the team and assigns each work item to a release and a sprint. One of the fields in the work item is using the global list as the pick list.
You need to assign the minimum permissions to export the work item type definition, including the global lists.
Which two permissions should you use? Each correct answer presents a complete solution.

문제 2

You are using Microsoft Test Manager (MTM) to manually test for an ASP.NET website. You have previously created a test plan named QA Release 1.0 that contains 115 test cases, and you are now planning the testing for Release 2.0.
The QA Release 2.0 test plan must meet the following requirements:
- All the test cases in QA Release 1.0 should be available in QA Release 2.0.
- Testers should be able to change, add, or remove test cases from either the QA Release 1.0 test plan or the QA Release 2.0 test plan as required, without affecting the other test plan.
- Shared steps and test configuration from the QA Release 1.0 test plan need to be reflected in QA Release 2.0 test plan.
You need to facilitate simultaneous testing of the website by creating the QA Release 2.0 test plan according to the stated requirements.
What should you do?

문제 3

You are using Microsoft Test Manager (MTM) to run a test case. During the previous run of the same test case, a bug was filed. The developer could not reproduce the bug. The test settings assigned to the test plan do not include an adapter to collect IntelliTrace data.
You have created a test setting that includes the IntelliTrace data adapter.
You need to re-run the test with the settings that have the IntelliTrace data adapter.
What should you do?

문제 4

DRAG DROP
You are using Microsoft Test Manager (MTM) to manage your testing efforts.
You want to see which work items have changed since the last time you assigned a build to the test plan.
You need to assign a new build to the test plan and create a list of the bugs that have been fixed and the features that have been associated with the new build.
What should you do? (To answer, move the three appropriate actions from the list of actions to the answer area and arrange them in the correct order.)

문제 5

You are using Microsoft Test Manager (MTM).
You plan to redesign a group of test cases that have similar steps but test for different conditions.
You need to make the test cases easy to maintain.
What should you do?