C4040-251 무료 덤프문제 온라인 액세스
| 시험코드: | C4040-251 |
| 시험이름: | Power Systems with POWER8 Scale-out Technical Sales Skills V1 |
| 인증사: | IBM |
| 무료 덤프 문항수: | 158 |
| 업로드 날짜: | 2026-07-17 |
A customer recently installed a new 6-core S824 with the (18) SFF-3 by storage backplane fully populated with HDDs. They want to include (4) SSDs to improve hot data performance. The customer wants to avoid the cost of adding an EXP24S I/O drawer to place the SSDs.
Which of the following will satisfy the customer's requirements to improve the hot data performance?
A customer has a 2-core POWER6 system with five partitions and two PowerVM Standard
Edition licenses, and wants to migrate to a 6-core Power SB14.
Which licensing requirement is necessary to accomplish their migration?
A customer is setting up two new partitions where IBM i is hosting the storage. The customer's high priority is to complete the backups to physical tape as fast as possible, while automating the movement of the single tape library between the partitions Tape library functions are needed for the backup.
Which combination of storage virtualization will achieve the customer's backup priority''
A customer needs a new server for their database currently running on a 16-core POWER7
4.1 GHz based server. Oracle has informed the customer that their SPARC T5 based servers are best suited for running databases, because the SPARC T5 has eight threads per core, while the current servers only allow for up to four threads per core.
Which of the following statements could be correctly used to repudiate the Oracle claim?