문제 1

A scrum master has defined which groups of people will work on different aspects of the project and has requested assistance from an administrator to help organize the project accordingly.
Which of the following would the administrator configure to assist with this?

문제 2

A developer has been assigned the following roles, in order, for the project area:
* Team Member
* Stakeholder
and the following roles, in order, for the team area:
1. Release Engineer
2. Developer
Deliver preconditions have been configured for the team area.
Which role is considered first during the deliver operation to a stream owned by the team area?

문제 3

A manager wants to know how long work items are staying in the In Progress state.
Which type of trend report will show this?

문제 4

The scrum master moves a story in the Quick Planner from the backlog to a sprint plan.
Which attribute on the story was automatically updated by this action?

문제 5

An administrator is designing the representation of the following:
1) which team is responsible for work items
2) in which build the defects were discovered
3) the timeframe for the work item to be completed
Which of the following shows the correct relationships?