If a project requires the management system to be connected to a third-party generator set, two smart meters 1 (same model), and two precision air conditioners (same model), the management system needs to report () a third-party equipment access fee?

문제 2

When the UPS is in parallel, the input phase sequence of the main bypass of each UPS needs to be checked, and the output phase sequence of a single pair is not required.

문제 3

What can users do through the ECC800WEB interface? (Multiple choice)

문제 4

A single row of FusionModule 2000 supports a maximum of 48 cabinets.

문제 5

FusionModule2000UPS is listed as an integrated UPS and supports up to 125kW.