문제 1

When the integrated UPS is wired, if the input phase sequence is wrong, the machine will not work.

문제 2

After the UPS5000 is installed with ejector fan, you need to set the status of "Ejector Fan" as "Allow" in the menu. Otherwise, the ejector modules cannot be used normally.

문제 3

When connecting the refrigerant pipe, to prevent the pipe from being oxidized, it is necessary to introduce a small amount of nitrogen gas during welding.

문제 4

When the temperature detector or smoke detector in the FusionModule1000 generates an alarm, ( ) emits a continuous beeping sound to remind you to take measures as soon as possible to avoid a major accident. (Multiple choice)

문제 5

Which of the following supports the UPS5000-E-400K-FM input line voltage? (Multiple choice)