H11-828 무료 덤프문제 온라인 액세스

시험코드:H11-828
시험이름:Huawei Certified Network Professional - Unified Communication (HCNP-UC)
인증사:Huawei
무료 덤프 문항수:220
업로드 날짜:2026-08-30
평점
100%

문제 1

The administrator can export the account file from the BMU, modify account information in the account file, and upload the modified file to the BMU to modify account information in the directory in batches.

문제 2

The console system must consist of (). (Multiple Choice)

문제 3

In a multi-node centralized network, there is a central node with a U1981 deployed, and two branch nodes, one with a U1911 and the other with a U1960. After a call from SIP user A under U1911 to SIP user B under U1960 is connected, the path along which the RTP streams are transmitted is ().

문제 4

A company deploys a U1981 unified gateway, BMU, and CDRServer. The administrator wants to query CDRs within a time segment. Which of the following methods can the administrator use? (Multiple Choice)

문제 5

U1900 series unified gateways are deployed in redundancy mode in an enterprise. One day, a communication fault occurs, so all users cannot make voice calls. The cause of the fault is that the active gateway breaks down, but the standby gateway does not take over services from the active gateway. In this case, which of the following methods is the most suitable?

댓글 추가

귀하의 메일주소는 공개되지 않습니다. 필수 입력 사항은 표시되어 있습니다. *

insert code
그림의 인증번호를 입력하세요.