CDT 무료 덤프문제 온라인 액세스

시험코드:CDT
시험이름:Construction Documents Technologist
인증사:Construction Specifications Institute
무료 덤프 문항수:122
업로드 날짜:2026-01-10
평점
100%

문제 1

Which document directly modifies the requirements of the general conditions?

문제 2

How long after bid opening is a bidder required to honor their bid price for a project?

문제 3

There are over 3,500 different grades of steel. The amount of carbon, level of impurities, and additional elements all contribute to what grade steel is classified as in building projects. Therefore, which of the following is the method of specification writing used to limit lengthy descriptions of materials?

문제 4

Under the design-bid-build project delivery, what is the next step after the procurement phase has ended to award the contract for construction?

문제 5

Who is responsible for accepting and inspecting for damage of the owner-furnished products delivered to the project site?

댓글 추가

귀하의 메일주소는 공개되지 않습니다. 필수 입력 사항은 표시되어 있습니다. *

insert code
그림의 인증번호를 입력하세요.