Construction-Manager 무료 덤프문제 온라인 액세스
시험코드: | Construction-Manager |
시험이름: | Certified Construction Manager (CCM) |
인증사: | CMAA |
무료 덤프 문항수: | 67 |
업로드 날짜: | 2025-10-21 |
When applying BIM to a project, which method checks for interferences by searching for intersecting volumes?
An owner requests a cost estimate for a project during the design phase with an estimated present-day budget of $10M. Construction is scheduled for 24 months. Escalation is 5% for the project duration. What is the projected cost for the project?
The contract documents normally require which party/parties to coordinate the transfer of spare parts and warranties to the owner?
A dispute arises during construction after the contractor encounters what they feel is unsuitable material. The CM is not notified about the areas of concern, and the contractor hauls 10.000 cy of material offsite. Three months later, the contractor submits a claim for additional cost to haul the material off. The CM should advise the owner that