문제 1

Which of the following activities are included within activity based management (ABM)?
1. Cost reduction
2. Product design decisions
3. Variance analysis
4. Operational control
5. Performance evaluation

문제 2

A new product is being manufactured for the first time. The first unit required 600 minutes of labor to manufacture. It is expected that there will be a 90% learning curve for the first 20 units.
The learning index for a 90% learning curve is - 0.152.
Calculate the expected labor time to manufacture the 10th unit.
Your answer should be given to the nearest whole minute.

문제 3

Which TWO of the following statements are correct?

문제 4

Which of the following statements is NOT correct?
Transfer prices between responsibility centers should be set at a level that:

문제 5

The money cost of capital is 12%. The expected rate of inflation is 4%. What is the real cost of capital?
Give your answer to 2 decimal places.