문제 1

While identifying scenario's for the use case "copy A4 - A4" for a new copier, the following scenario's were identified:
Basic scenario: single side to single side
Deviations: single side to double side, copy of a set, copy using the automatic document feeder
Failures: no paper in paper tray, paper jam, out of staples
How many test cases will be needed to achieve minimum coverage?
[K3] 2 credits

문제 2

A temperature unit holds the temperature between 10 degrees Celcius and -10 degrees Celcius. If the temperature drops below -10 or rises above 10 then an alarm rings. Boundary Value Analysis tests are drawn up using the approach of two test cases per boundary. The temperatures to be tested are:
[K3] 2 credits

문제 3

As a test analyst you are involved in the early stages of an acceptance test for a Product Data Management system. You are asked to write test designs and test cases based on use cases. An early version of the system is also already available. It is a known fact that on the implementation level many things will change (including the user-interface). The tests will be carried by end-users with much domain knowledge who have also been involved in the project defining the user requirements and reviewing documentation.
What is the BEST option regarding the level of detail and documentation required for test cases in the project?
[K4] 3 credits

문제 4

A car navigation system needs to be integrated in the overall car software. Interoperability testing is thus considered to be important. Which of the following techniques is most likely be used to support interoperability tests?
[K2] 1 credit

문제 5

Which of the following criteria on test progress would enable the business to determine a likely 'go live' date?
(i)
Number of tests planned versus number of tests executed
(ii)
Number of high priority defects outstanding
(iii) The test team's timesheets in order to show how much effort has been devoted to testing
(iv)
Number of tests passed and number failed
(v)
Number of defects found in each development area
(vi)
The rate at which defects are being found
[K2] 1 credit