6202 무료 덤프문제 온라인 액세스
| 시험코드: | 6202 |
| 시험이름: | Avaya Aura(TM) Contact Center Implementation Exam |
| 인증사: | Avaya |
| 무료 덤프 문항수: | 65 |
| 업로드 날짜: | 2026-05-25 |
You are currently implementing HA (High Availability ) campus solution on the Contact Center
Manager Server (CCMS), and have done he following
. installed the standby server with its own ELAN and Contact Center LAN IP addresses
. obtained two IP addresses for the managed IP addresses ELAN and the Contact Center LAN
. configured the hosts file and the DNS that will reflect the new managed IP addresses
. marked the server as active with all of the managed IP and standby server IP addresses on the active
server under server mode configuration screen
What is the next step in the deployment of campus HA?
Which main components on Avaya Aura(TM) for Midsize Enterprises (formerly known as MBT), must be
configured to integrate with Contact Center Manager Server (CCMS) in an Avaya Aura(TM) Contact Center
environment?
Which three items will backed up using the Contact Center manager Administration (CCMA) Backup
and Restore utility? (Choose three)
Which pre-installation preparations must be completed on a Platform Vendor Independent (PVI) server
before installing Avaya Aura(TM) Contact Center server applications?
You are migrating a CCMS database from a previous release of Contact Center Manager Server
(CCMS) which was co-resident with Command Control Toolkit (CCTT), and is about to restore the
database using the restore option from the database maintenance utility, The new CCMS is co-resident
with CCT
What will corrupt the database once the restore has completed?