6101-1 무료 덤프문제 온라인 액세스

시험코드:6101-1
시험이름:Avaya Ethernet Routing Switch Implementation Exam
인증사:Avaya
무료 덤프 문항수:70
업로드 날짜:2026-10-14
평점
100%

문제 1

In Ethernet Routing Switch (ERS) 5600 switch was added into the existing ERS 5500 stack, but ft did not form a proper stack.
Which statement describes the problem?

문제 2

What is the maximum number of Gigabit Ethernet ports on a single Ethernet Routing Switch (ERS) 8300 Input/Output module?

문제 3

In a newly installed network the port LED on an Ethernet Routing Switch (ERS) 5500 is amber, not green. What does this mean?

문제 4

A technician is adding the Virtual Link Aggregation Control Protocol (VLACP) configuration ID a Converged Campus Solution where all Ethernet Routing switches (ERSs) are directly connected without intermediary WAN transport devices
What are two key configuration tasks? (Choose two)

문제 5

An engineer needs to assign an IP address of 172 25 10.31 for out of band management of an Ethernet Routing switch (ERS) 8600 switch a subnet mask of 255.255.255.192.
Which command line interface (CLI) command should the engineer use?

댓글 추가

귀하의 메일주소는 공개되지 않습니다. 필수 입력 사항은 표시되어 있습니다. *

insert code
그림의 인증번호를 입력하세요.